
Installation Procedures and Torques for Fluid Connections
NORM herausgegeben am 1.10.2019
Designation standards: SAE AS683E
Publication date standards: 1.10.2019
Country: American technical standard
Kategorie: Technische Normen SAE
These procedures cover the following:
Section 3 - Cone end connections for flared tube and brazed ferrule, with and without gasket.
Section 4 - Boss end connections, positioned type, with back-up ring.
Section 5 - Boss end connections, positioned type, without back-up ring.
Section 6 - Boss end connections, non-positioned type.
Section 7 - Bulkhead connections.
SUBFILE: Aerospace
TYPE OF DOCUMENT: Aerospace Standard