Standard Practice for Installing Factory-Made Corrugated Aluminum Culverts and Storm Sewer Pipe
Automatische name übersetzung:
Standard Praxis für die Installation von werkseitig gewellten Aluminium Durchlässe und Sturmabwasserrohr
NORM herausgegeben am 1.11.2009
Bezeichnung normen: ASTM B788/B788M-09
Anmerkung: UNGÜLTIG
Ausgabedatum normen: 1.11.2009
SKU: NS-8125
Zahl der Seiten: 5
Gewicht ca.: 15 g (0.03 Pfund)
Land: Amerikanische technische Norm
Kategorie: Technische Normen ASTM
Keywords:
aluminum pipe, corrugated aluminum pipe, culvert, installation´underground, joining systems, sewers, Aluminum alloys (structural), Aluminum pipe, Backfill, Corrugated aluminum pipe, Culvert pipe, Pipe-arches, Regular backfill, Sewer pipe (aluminum alloy), Soil, Soil tightness, Storm sewer/drainage pipe (Al/Al alloy), Structural backfill, Underground installation--pipe materials/applications, Aluminum alloys (pipe), ICS Number Code 91.140.80 (Drainage systems)
| Significance and Use | ||||||||||||||||
|
Corrugated aluminum pipe functions structurally as a flexible ring which is supported by and interacts with the compacted surrounding soil. The soil constructed around the pipe is thus an integral part of the structural system. It is therefore important to ensure that the soil structure or backfill is made up of acceptable material and is well-constructed. Field verification of soil structure acceptability using Test Methods D1556, D2167, D2937, or D6938 as applicable, and comparing the results with Test Method D698 in accordance with the specifications for each project, is the most reliable basis for installation of an acceptable structure. The required density and method of measurement are not specified by this practice, but they must be established in the specifications for each project. |
||||||||||||||||
| 1. Scope | ||||||||||||||||
|
1.1 This practice describes procedures, soils, and soil placement for the proper installation of corrugated aluminum culverts and storm sewers in either trench or projection installations. A typical trench installation is shown in Fig. 1, and a typical embankment (projection) installation is shown in Fig. 2. The pipes described in this practice are manufactured in a factory and furnished to the job in lengths ordinarily from 10 to 30 ft [3 to 9 m], with 20 ft [6 m] being common, for field joining. This practice applies to structures designed in accordance with Practice B790/B790M. 1.2 The values stated in either SI units or inch-pound units are to be regarded separately as standard. The values stated in each system may not be exact equivalents; therefore, each system shall be used independently of the other. Combining values from the two systems may result in non-conformance with the standard. 1.2.1 SI Units—SI units are shown in the text in brackets, and they are the applicable values for metric installation. 1.3 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.
|
||||||||||||||||
| 2. Referenced Documents | ||||||||||||||||
|
Bereitstellung von aktuellen Informationen über legislative Vorschriften in der Sammlung der Gesetze bis zum Jahr 1945.
Aktualisierung 2x pro Monat!
Brauchen Sie mehr Informationen? Sehen Sie sich diese Seite an.
Letzte Aktualisierung: 2026-05-15 (Zahl der Positionen: 2 278 685)
© Copyright 2026 NORMSERVIS s.r.o.