Standard Practice for Least Cost (Life Cycle) Analysis of Concrete Culvert, Storm Sewer, and Sanitary Sewer Systems (Includes all amendments And changes 10/30/2015).
Automatische name übersetzung:
Standard Praxis für Least Cost (Life Cycle) Analyse der Beton Culvert, Sturm Kanalisation und Abwassersysteme
NORM herausgegeben am 1.12.2010
Bezeichnung normen: ASTM C1131-10e1
Anmerkung: UNGÜLTIG
Ausgabedatum normen: 1.12.2010
SKU: NS-9640
Zahl der Seiten: 6
Gewicht ca.: 18 g (0.04 Pfund)
Land: Amerikanische technische Norm
Kategorie: Technische Normen ASTM
Keywords:
acceptance criteria, concrete, costs, culvert, inflation rate, interest rate, least cost analysis, life cycle analysis, pipe, procedures, project design life, sanitary sewer, service life, storm sewer, Bidding (on projects), Building economics, Construction materials, Culvert pipe (concrete), Design--piping systems, Inflation/interest effects, Least cost analysis (LCA), Life-cycle cost (LCC) analysis, Maintenance, Preconstruction evaluation, Project design life
Significance and Use | ||
The significance of the LCA method is that it is a comprehensive technique for taking into account all relevant monetary values over the project design life and provides a measure of the total cost of the material, system, or structure. The LCA method can be effectively applied in both the preconstruction and bid stages of projects. After bids are taken, real costs can be used instead of estimates. |
||
1. Scope | ||
1.1 This practice covers procedures for least cost (life cycle) analysis (LCA) of materials, systems, or structures proposed for use in the construction of concrete culvert, storm sewer, and sanitary sewer systems. Note 1—As intended in this practice, examples of analyses include, but are not limited to the following: (1) materials-pipe linings and coatings, concrete wall thicknesses, cements, additives, etc.; (2) systems-circular pipe, box sections, multiple lines, force mains, etc.; and (3) structures-wet and dry wells, pump and lift stations, etc. 1.2 The LCA method includes costs associated with planning, engineering, construction (bid price), maintenance, rehabilitation, replacement, and cost deductions for any residual value at the end of the proposed project design life. 1.3 For each material, system, or structure, the LCA method determines in present value constant dollars, the total of all initial and future costs over the project design life, and deducts any residual value. 1.4 Major factors in the LCA method include project design life, service life, and relevant interest and inflation rates. |
||
2. Referenced Documents | ||
|
Wollen Sie sich sicher sein, dass Sie nur die gültigen technischen Normen verwenden?
Wir bieten Ihnen eine Lösung, die Ihnen eine Monatsübersicht über die Aktualität der von Ihnen angewandten Normen sicher stellt.
Brauchen Sie mehr Informationen? Sehen Sie sich diese Seite an.
Letzte Aktualisierung: 2024-05-05 (Zahl der Positionen: 2 897 047)
© Copyright 2024 NORMSERVIS s.r.o.