Wir benötigen Ihre Einwilligung zur Verwendung der einzelnen Daten, damit Sie unter anderem Informationen zu Ihren Interessen einsehen können. Klicken Sie auf "OK", um Ihre Zustimmung zu erteilen.
Standard Practice for Performing and Reporting Cost Analysis During the Design Phase of a Project
Automatische name übersetzung:
Standard Praxis für Darstellende und Reporting Kostenanalyse in der Planungsphase eines Projekts
NORM herausgegeben am 1.4.2012
Bezeichnung normen: ASTM E1804-12
Anmerkung: UNGÜLTIG
Ausgabedatum normen: 1.4.2012
SKU: NS-43111
Zahl der Seiten: 4
Gewicht ca.: 12 g (0.03 Pfund)
Land: Amerikanische technische Norm
Kategorie: Technische Normen ASTM
Company organization and management in generalConstruction industry in general
Keywords:
analysis, cost, design, estimating, Building design and construction, Building economics, Cost analysis (of building constructions), ICS Number Code 03.100.01 (Company organization and management in general), 91.010.01 (Construction industry in general)
Significance and Use | ||||||||||
This practice increases the level of communication, provides an organized approach to cost control during the design of a project, and also provides a means of identifying extraordinary cost items and changes in assumptions between estimates. The users of this practice include owners, developers, contractors, cost professionals, estimators, architects, engineers, specification writers, quantity surveyors, and anyone charged with the responsibility of successfully managing the design of a building and its related site work within a specified project budget. Use this reporting format during the following: Contracting for design cost analysis services, Comparing the current design costs to a previous estimate, and Responding to each design phase. This practice provides a tool for analyzing design options and examining strategies to maintain the project budget. |
||||||||||
1. Scope | ||||||||||
1.1 This practice covers an arranged method for providing cost analysis during the design phase of a building project. 1.2 The use of this practice increases the level of communication between the design professional, owner, and the cost professional providing the cost consulting services. 1.3 The practice establishes a structured method to support design decisions. 1.4 The practice provides design and cost professionals with a framework for historically tabulating information to be used on relevant future projects. |
||||||||||
2. Referenced Documents | ||||||||||
|
Historisch
1.8.2009
Historisch
1.1.2013
Historisch
1.3.2011
Historisch
1.3.2011
Historisch
1.7.2011
Historisch
1.2.2008
Bereitstellung von aktuellen Informationen über legislative Vorschriften in der Sammlung der Gesetze bis zum Jahr 1945.
Aktualisierung 2x pro Monat!
Brauchen Sie mehr Informationen? Sehen Sie sich diese Seite an.
Letzte Aktualisierung: 2024-05-07 (Zahl der Positionen: 2 897 585)
© Copyright 2024 NORMSERVIS s.r.o.