Wir benötigen Ihre Einwilligung zur Verwendung der einzelnen Daten, damit Sie unter anderem Informationen zu Ihren Interessen einsehen können. Klicken Sie auf "OK", um Ihre Zustimmung zu erteilen.
Standard Practice for Performing and Reporting Cost Analysis During the Design Phase of a Project
Name übersetzen
NORM herausgegeben am 1.10.2016
Bezeichnung normen: ASTM E1804-16
Anmerkung: UNGÜLTIG
Ausgabedatum normen: 1.10.2016
SKU: NS-666080
Zahl der Seiten: 4
Gewicht ca.: 12 g (0.03 Pfund)
Land: Amerikanische technische Norm
Kategorie: Technische Normen ASTM
Company organization and management in generalConstruction industry in general
Keywords:
analysis, cost, design, estimating,, ICS Number Code 03.100.01 (Company organization and management in general),91.010.01 (Construction industry in general)
Significance and Use | ||||||||||
5.1 This practice increases the level of communication, provides an organized approach to cost control during the design of a project, and also provides a means of identifying extraordinary cost items and changes in assumptions between estimates. 5.2 The users of this practice include owners, developers, contractors, cost professionals, estimators, architects, engineers, specification writers, quantity surveyors, and anyone charged with the responsibility of successfully managing the design of a building and its related site work within a specified project budget. 5.3 Use this reporting format during the following: 5.3.1 Contracting for design cost analysis services, 5.3.2 Comparing the current design costs to a previous estimate, and 5.3.3 Responding to each design phase. 5.4 This practice provides a tool for analyzing design options and examining strategies to maintain the project budget. |
||||||||||
1. Scope | ||||||||||
1.1 This practice covers an arranged method for providing cost analysis during the design phase of a building project. 1.2 The use of this practice increases the level of communication between the design professional, owner, and the cost professional providing the cost consulting services. 1.3 The practice establishes a structured method to support design decisions. 1.4 The practice provides design and cost professionals with a framework for historically tabulating information to be used on relevant future projects. |
||||||||||
2. Referenced Documents | ||||||||||
|
Wollen Sie sich sicher sein, dass Sie nur die gültigen technischen Normen verwenden?
Wir bieten Ihnen eine Lösung, die Ihnen eine Monatsübersicht über die Aktualität der von Ihnen angewandten Normen sicher stellt.
Brauchen Sie mehr Informationen? Sehen Sie sich diese Seite an.
Letzte Aktualisierung: 2024-04-18 (Zahl der Positionen: 2 859 866)
© Copyright 2024 NORMSERVIS s.r.o.