Standard Classification for Allowance, Contingency, and Reserve Sums in Building Construction Estimating
Automatische name übersetzung:
Standardklassifikation für Allowance, Kontingenz, und Reserve Sums in Hochbau Estimating
NORM herausgegeben am 1.5.2016
Bezeichnung normen: ASTM E2168-10(2016)
Anmerkung: UNGÜLTIG
Ausgabedatum normen: 1.5.2016
SKU: NS-637694
Zahl der Seiten: 8
Gewicht ca.: 24 g (0.05 Pfund)
Land: Amerikanische technische Norm
Kategorie: Technische Normen ASTM
Keywords:
allowance, budgeting, building economics, classification, construction estimating, contingency, cost control, cost estimating, cost planning, cost risk, reserve, UNIFORMAT II,, ICS Number Code 91.010.20 (Contractual aspects)
Significance and Use | ||||||||||||
4.1 When preparing construction, project, and program cost estimates, it is often necessary to make monetary provision for change or risk, or both, or other exigencies where information is incomplete. 4.2 Such allowance, contingency or reserve sums are employed by many persons engaged in the planning, delivery, and financing of construction work. 4.3 These users include owners, developers, facilities programmers, cost planners, estimators, schedules, architects and engineers, specification writers, operating and maintenance staff, manufacturers, educators, financial managers, and comptrollers. 4.4 Usage: 4.4.1 These sums are especially appropriate when performing the following activities:
4.4.2 In any of these activities a needed requirement, or component, of the planned construction can be known while the defined solution, design or specification, for providing this may not. The usual, and appropriate, response in these situations, is the inclusion of a monetary sum, within an estimate, to provide for this (these) requirement(s). 4.4.3 Such sums may be general or specific in scope, may be planned to be spent or may only be included as possible mitigation for unplanned events and requirements. 4.4.4 To distinguish between these sums, and in recognition of their differing purpose, they are described, and classified here, using the terms allowance, contingency, or reserve. Note 1: Section 5
includes a generic statement of purpose for each of the three terms
and provides a sub-classification that distinguishes between sums
included for specific purposes and for non-specific, that is,
general purposes. In cost budgeting, conceptual and design
estimating especially, an estimator may intuitively recognize the
need for a general purpose sum. This recognition comes in the
absence of any known specific requirement other than the need to
ensure the estimate total is a reasoned forecast of a reasonable
bid result.
4.5 This classification defines allowance, contingency, and reserve sums as items common to construction, project, and program estimates through planning, design, construction, and completion. The terms are sufficiently generic to be applied in all forms of construction work. |
||||||||||||
1. Scope | ||||||||||||
1.1 This classification establishes a classification for allowance, contingency, and reserve sums used in construction, project, and program estimating. 1.2 This classification applies to all construction work. 1.3 This classification is not based on permanent physical elements of construction (as defined and classified in Classification E1557). Rather, the classification items are cost components common to construction, project, and program estimates. |
||||||||||||
2. Referenced Documents | ||||||||||||
|
Wollen Sie sich sicher sein, dass Sie nur die gültigen technischen Normen verwenden?
Wir bieten Ihnen eine Lösung, die Ihnen eine Monatsübersicht über die Aktualität der von Ihnen angewandten Normen sicher stellt.
Brauchen Sie mehr Informationen? Sehen Sie sich diese Seite an.
Letzte Aktualisierung: 2024-03-25 (Zahl der Positionen: 2 885 931)
© Copyright 2024 NORMSERVIS s.r.o.