Wir benötigen Ihre Einwilligung zur Verwendung der einzelnen Daten, damit Sie unter anderem Informationen zu Ihren Interessen einsehen können. Klicken Sie auf "OK", um Ihre Zustimmung zu erteilen.
Bezeichnung normen: UIC B177.4/RP3-1ed.
Ausgabedatum normen: 1.3.2020
SKU: NS-1190415
Zahl der Seiten: 28
Gewicht ca.: 84 g (0.19 Pfund)
Land: Internationale technische Norm
Kategorie: Technische Normen UIC
This report documents the results of simulations carried out within the context of the Long Train project. The simulations were carried out in accordance with the methodology described in UIC Leaflet 421, comparing "reference trains" with new trains formed by coupling between two and four trains. The results demonstrate the need to increase the number of traction units when overall train length increases. In trains of up to 700 m - and up to 1,000 m in some cases - a train consist of two traction units is appropriate. However, in longer trains of 1,500 m and above, four traction units are required. All of the results obtained from the simulations may change depending on the technology used for the distributed power system, as well as the minimum track radius and the admissible longitudinal compressive forces of the wagons.
Bereitstellung von aktuellen Informationen über legislative Vorschriften in der Sammlung der Gesetze bis zum Jahr 1945.
Aktualisierung 2x pro Monat!
Brauchen Sie mehr Informationen? Sehen Sie sich diese Seite an.
Letzte Aktualisierung: 2025-07-14 (Zahl der Positionen: 2 208 183)
© Copyright 2025 NORMSERVIS s.r.o.