Publikation  VDA Product creation - Maturity Level Assurance for new Parts - Methods, measurement criteria, documentation - 2nd revised edition, Oct. 2009 English version published in July 2010 1.1.2010 Ansicht

VDA Product creation - Maturity Level Assurance for new Parts - Methods, measurement criteria, documentation - 2nd revised edition, Oct. 2009 English version published in July 2010

VDA Product creation - Maturity Level Assurance for new Parts - Methods, measurement criteria, documentation - 2nd revised edition, Oct. 2009 English version published in July 2010

Name übersetzen

PUBLIKATION herausgegeben am 1.1.2010


ZugänglichkeitAusverkauft
PreisAUF ANFRAGE ohne MWS
AUF ANFRAGE

Produktinformation:

Bezeichnung: VDA Product creation - Maturity Level Assurance for new Parts - Methods, measurement criteria, documentation - 2nd revised edition, Oct. 2009 English version published in July 2010
Gewicht ca.: 300 g (0.66 Pfund)
Ausgabedatum: 1.1.2010
Land: Deutsche Publikation
*) Bei der Ware, die nicht vorrätig ist und muss bei dem Herausgeber bestellt werden, werden auch die tatsächlichen Transport- und Verpackungskosten berechnet. Die Kostenhöhe teilen wir Ihnen nach Ihrer Nachfrage auf der E-Mail info@normservis.cz, evtl. auf der Telefonnummer +420 566 621 759 mit.

Die Annotation des Normtextes:



Short description to VDA Volume “Maturity Level Assurance for new Parts”

This present volume is a revision of the first issue, dated November 2006. The revision was carried out as the result of feedback regarding the potential for standardisation, generated from pilot projects and training carried out between suppliers and OEMs.
The most significant changes and adaptations which have been made are:


The introduction of an additional maturity level (ML5): "Parts from production tools and production facilities are available" (resulting in levels of ML0 to ML7)

Revision of measurement criteria, including maturity level indicators (ML0-7) and synchronisation with VDA 6.3 (new)

Directing the measurement criteria toward the validation of product and process

Set of measurement criteria are now a valid standard, replacing OEM-specific maturity level methods, and apply to all new parts

Differentiated use of maturity level assurances for parts classified as A, B and C (prioritized) risks.
This publication is a guideline for companies in the automotive industry in implementing maturity level methodology in the validation of the products they receive from their suppliers. It may also be regarded as a requirement in a customer-supplier relationship (included, for example, in purchasing conditions, requirements specifications and project-specific requirements).

Contents





1

Preface


2

Objective, purpose and scope of the study


2. 1

Objective and purpose


2.2

Scope of the study


2.2.1

Risk classification (prioritizing)


2.2.2

Applying maturity level assurance depending on risk classification


2.3

Applying maturity level assurance in the supply chain


3

Contents of maturity levels


3. 1

Phases


3.2

Pre-Requisite


3.3

Start


3.4

Control


3.4.1

Preparation


3.4.2

Assessment


3.4.3

Carrying out maturity level assurance depending on the risk classification (prioritization)


3.4.4

Implementation


3.5

Status report covering maturity level, corrective actions and escalation


3.5.1

Maturity level status report


3.5.2

Escalation


4

Communication in the supply chain


4.1

Forms of communication


4.1.1

Exchange of information at "Round Table" meetings ("A" risk-classified (prioritized) parts)


4.1.1.1

Responsibilities


4.1.2

Exchange of information via "supplier self-assessment"


4.1.2.1

The supplier presents his assessment and actions to the customer ("B" risk-classified (prioritized) parts)


4.1.2.2

Information provided by the supplier via electronic data processing ("C" risk-classified (prioritized) part)


5

Standards in the process


5.1

Risk assessment and classification (recommendation)


5.2

Set of measurement criteria for maturity level assessments


I.

ML0 - Innovation release for full production development


II.

ML 1 - Requirements management for the contract to be issued


III.

ML2 - Specifying the supply chain and placing the order


IV.

ML3 - Release of technical specifications


V.

ML4 - Completion of production planning


VI.

ML5 - Parts from production too/s and production facilities are available


VII.

ML6 - Process and product approval


VIII.

ML7 - Project completion; transfer of responsibilities to Production/ Start requalification

Empfehlungen:

Aktualisierung der technischen Normen

Wollen Sie sich sicher sein, dass Sie nur die gültigen technischen Normen verwenden?
Wir bieten Ihnen eine Lösung, die Ihnen eine Monatsübersicht über die Aktualität der von Ihnen angewandten Normen sicher stellt.

Brauchen Sie mehr Informationen? Sehen Sie sich diese Seite an.




Cookies Cookies

Wir benötigen Ihre Einwilligung zur Verwendung der einzelnen Daten, damit Sie unter anderem Informationen zu Ihren Interessen einsehen können. Klicken Sie auf "OK", um Ihre Zustimmung zu erteilen.

Sie können die Zustimmung verweigern hier.

Hier können Sie Ihre Cookie-Einstellungen nach Ihren Wünschen anpassen.

Wir benötigen Ihre Einwilligung zur Verwendung der einzelnen Daten, damit Sie unter anderem Informationen zu Ihren Interessen einsehen können.