Standard Practice for Installing Corrugated Aluminum Structural Plate Pipe for Culverts and Sewers
Automatische name übersetzung:
Standard Praxis für die Installation von Corrugated Aluminum Strukturplatte Rohr für Durchlässe und Kanalisation
NORM herausgegeben am 1.5.2011
Bezeichnung normen: ASTM B789/B789M-99(2011)
Anmerkung: UNGÜLTIG
Ausgabedatum normen: 1.5.2011
SKU: NS-8127
Zahl der Seiten: 6
Gewicht ca.: 18 g (0.04 Pfund)
Land: Amerikanische technische Norm
Kategorie: Technische Normen ASTM
Keywords:
aluminum pipe, culvert, installationunderground, sewers, structural plate pipe, Structural backfill, Underground installation, Aluminum alloys (pipe), Aluminum alloys (structural), Aluminum pipe, Backfill, Corrugated aluminum pipe, Culvert pipe, Pipe-arches, Regular backfill, Sewer pipe (aluminum alloy), Soil, Soil tightness, Storm sewer/drainage pipe (Al/Al alloy), ICS Number Code 91.140.80 (Drainage systems)
Significance and Use | ||||||||||||||||||
Corrugated aluminum structural plate pipe functions structurally as a flexible ring that is supported by and interacts with the compacted surrounding soil. The soil placed around the structure is thus an integral part of the structural system. It is therefore important to ensure that the soil structure is made up of the acceptable material and well-constructed. Field verification of soil structure acceptability using Test Methods D1556, D2167, D2922, or D2937, as applicable, and comparing the results with Test Methods D698 or D1557, in accordance with the specifications for each project, is the most reliable basis for installation of an acceptable structure. The required density and method of measurement are not specified by this practice but must be established in the specifications for each project. |
||||||||||||||||||
1. Scope | ||||||||||||||||||
1.1 This practice covers procedures, soils, and soil placement for the proper installation of corrugated aluminum structural plate culverts and sewers in either trench or embankment installations. A typical trench installation is shown in Fig. 1, and a typical embankment (projection) installation is shown in Fig. 2. Structural plate structures as described herein are those structures factory fabricated in plate form and bolted together on site to provide the required shape, size, and length of structure. This practice applies to structures designed in accordance with Practice B790/B790M. 1.2 The values stated in either inch-pound units or SI units are to be regarded separately as standard. Within the text, the SI units are shown in brackets. The values stated in each system are not exact equivalents; therefore, each system shall be used independently of the other. Combining values from the two systems may result in nonconformance with the standard. 1.3 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use. |
||||||||||||||||||
2. Referenced Documents | ||||||||||||||||||
|
Historisch
1.6.2013
Historisch
1.5.2014
Historisch
1.12.2010
Historisch
1.8.2011
Historisch
1.2.2011
Historisch
1.5.2011
Wollen Sie sich sicher sein, dass Sie nur die gültigen technischen Normen verwenden?
Wir bieten Ihnen eine Lösung, die Ihnen eine Monatsübersicht über die Aktualität der von Ihnen angewandten Normen sicher stellt.
Brauchen Sie mehr Informationen? Sehen Sie sich diese Seite an.
Letzte Aktualisierung: 2024-05-05 (Zahl der Positionen: 2 897 047)
© Copyright 2024 NORMSERVIS s.r.o.